Since the water heating units were located outside the hospital buildings, we had to manufacture large diameter pipes with a SDR (Standard Dimensional Ratio) 11. The large pipes made of PP-RCT material, which is the optimal solution for hot water, are able to transport hot water reaching 70'C from the heating site to the hospital buildings while maintaining consistent water flow.